Skills Hub
equipment-service
System Evacuation (Vacuum Pump)
Always tested on the EPA 608
Pull a deep vacuum before charging a new or opened system.
About this skill
System evacuation to 500 microns (or 200 microns for hermetic systems), holding for 15 to 30 minutes to dehydrate, and verifying the vacuum holds before charging.
10 total steps
4 critical steps
Time limit: 30 min
What graders are watching for
- 1Pull to 500 microns for standard systems
- 2Hold for 15 to 30 minutes for dehydration
- 3A rise in pressure during isolation indicates a leak or moisture
Common mistakes (and how to avoid them)
- !Stopping the vacuum too early (leaves moisture in the system)
- !Not verifying the vacuum holds (skips leak test)
- !Using a single-stage pump on hermetic systems (need two-stage)
Practice this skill step-by-step
The static walkthrough above is the marketing overview. The full step-by-step interactive practice (with critical-step highlighting, per-step "why this matters" rationale, and what graders watch for on each individual step) is unlocked with a subscription.